Coles Elementary School; Manassas, VA
The renovation of this 50,000 square foot elementary school is currently under construction which includes a renewal of Classrooms, Media Center, Offices and Kitchen.  Accessibility upgrades are being made throughout the facility including door hardware and toilet rooms.  The existing electrical system requires replacement to provide the power and lighting conforming with the current standards.  New data lines, TV cable, fire alarm, clocks, intrusion alarm and public address systems will be included in the project.  The Main Office will be relocated from the center core of the building to the front, allowing for better security, with a new entry vestibule.

Godwin Middle School; Woodbridge, VA
The renewal of this 125,000 square foot middle school is currently under construction.  The work consist's of new floor finishes, wall finishes, casework and system upgrades in all classrooms.  The Art, Work and Family Studies and Science labs will be upgraded with wood casework.  A complete upgrade of the electrical systems included data lines, TV cable, fire alarm, clocks and public address systems.  A new Entry Office / Clinic will be added to the side the main entry.  This is a 625 square foot addition.

Pace West Special Education School; Haymarket, VA
This new single story 19 classroom special education school for grades K - 12 is currently under design.  Program to include: Administration Offices, Media Center, Time Out Area, combination Gym/Cafeteria, Work and Family Studies room, Science room and Resource spaces. 

Lanier Middle  School; Fairfax City, VA
Lanier Middle School is currently under construction on the first of three primary phases. The structure of the 70,000 square foot addition is complete allowing continued construction progress through the cold winter months ahead. Construction is expected to be completed by April 2007 as this school will become a vibrant new approach to the City of Fairfax's revitalized downtown.

Johns Hopkins University; Baltimore, MD
Architecture Inc. has been selected to design over 25,000 square feet of high security “SCIF” space for the Johns Hopkins University Applied Physics Lab.

W.T. Woodson High School; Fairfax, VA
W.T. Woodson High School is currently under construction and is scheduled to be completed in August 2009. This is a phased project involving five additions, totaling approximately 110,000 square feet, being added to the existing 301,453 square foot building. The project includes all new electrical, mechanical, and sprinkler systems.

Graham Road Elementary School; Falls Church, VA
Graham Road Elementary School is currently in the preliminary planning stages. This project is expected to be designed as a Community School to serve county residents.

 

 

 

 

Home | Who We Are | Portfolio | Locations
Staff Lounge
| Client Access | Sustainable Design | On The Boards | News

 
_Commercial Projects
_Educational Projects
_Healthcare Projects
_Hospitality Projects